Plan Review Information
A good review of plans helps to avoid future problems. By listing and locating equipment on floor plans and diagramming specifications for electrical, mechanical and plumbing systems, potential problems can be spotted while still on paper and modifications made before costly purchases, installation and construction.
Instructions
Section 8-201.11 of the 2009 Food Code indicates that properly prepared plans and specifications must be submitted for review and approval before:
- The construction of a food establishment;
- The conversion of an existing structure for use as a food establishment; or
- The remodeling of a food establishment or a change of type of food establishment or food operation as specified under ¶ 8-302.14(C) if the regulatory authority determines that plans and specifications are necessary to ensure compliance with this Code.
Plan Review Worksheet for permanent food establishments
Plan Review Manual (DOWNLOAD NOTE: This is a large document)
Plan Review Application
Standard Operating Procedures (SOPs)
Plan Review and SOP Packet for Special Transitory Food Units - STFUs (i.e. food trucks/trailers)
Plan Review Manual (STFUs/Food Trucks)
Plan Review Application (STFUs/Food Trucks)